- Preparation Work
- Begin Installation
- 1. Measuring the lower rail installation position. lf there is no gap, just install it close to the window frame.
- 2. Measuring power rail installation locations. lf there is no gap, just install it close to the window frame.
- 3. Align the lower frame with the marking point and fix it with screws
- 4. Then insert the two power rails diagonally into the lower frame and secure with screws.
- 5. Adjust the sliders in the left and right rails so that the topand bottom are staggered.This will facilitate the next step of installation.
- 6. Put the left and right fabric traction bar into the carriage.
- 7. The top rail must be tightly clamped to the gearboxto prevent it from falling.
- 8. Install the motor.
- 9. Tighten the rope in the direction of the ree!.
- 10. Insert the splicing strip on the other side and lock it with the spindle on one end of the cord winder.
- 11. lnstall the T-shape blackout panel.
- 12. Complete the installation.
Motorized skylight cellular shades are a increasingly popular shading and decorative product in modern homes. They not only provide good light control and privacy protection, but also add convenience through electric operation. Here are the detailed installation steps:
Preparation Work
- Tool Preparation: Ensure that you have the necessary tools, such as a power drill, screwdriver, ruler, etc.
- Location Planning: Determine the installation location of the honeycomb shade, making sure it does not interfere with the opening of the window.
Begin Installation
1. Measuring the lower rail installation position. lf there is no gap, just install it close to the window frame.
2. Measuring power rail installation locations. lf there is no gap, just install it close to the window frame.
3. Align the lower frame with the marking point and fix it with screws
4. Then insert the two power rails diagonally into the lower frame and secure with screws.
Punch and fix
5. Adjust the sliders in the left and right rails so that the topand bottom are staggered.This will facilitate the next step of installation.
6. Put the left and right fabric traction bar into the carriage.
7. The top rail must be tightly clamped to the gearboxto prevent it from falling.
8. Install the motor.
9. Tighten the rope in the direction of the ree!.
Note:If you don't have this accessory because the blinds are too small, you can ignore this step.
10. Insert the splicing strip on the other side and lock it with the spindle on one end of the cord winder.
11. lnstall the T-shape blackout panel.
Punch and fix
Leave a comment
All comments are moderated before being published.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.